Switchgear operating procedures 2018/03/23
Power transmission operation steps: 1. First install the rear cover and close the front door. 2. Operate the earthing switch to open the spindle and open it. 3. Push the trolley (in the...
Switch cabinet classification 2018/03/23
Classified by voltage level: According to the voltage level classification, AC1000V and below are generally referred to as low-voltage switchgear (such as PGL, GGD, GCK, GBD, MNS, etc.) and AC1...
Switch cabinet brief description 2018/03/23
The switch cabinet is an electrical device. The outside of the switchgear cabinet first enters the main control switch in the cabinet, and then enters the sub-control switch. Each branch is set acc...
Classification of power distribution box 2018/03/23
Classified according to the requirements of the power supply system: 1) First-level power distribution equipment, collectively referred to as power distribution center. They are centrally insta...
Power distribution box installation 2018/03/23
The distribution box divides the power distribution box and the lighting distribution box and is the last equipment of the distribution system. The distribution box is composed of switchgear, measu...
PLC Control Cabinet Overview 2018/03/23
The PLC control cabinet refers to the programmable control cabinet, the control cabinet refers to the complete control cabinet, and the electrical cabinet that can control the motor and the switch....